Most building problems in Guanacaste start before construction does.
1. Skipping proper land due diligence
Don’t rely on verbal assurances. Before you buy, have a lawyer review boundaries and title, confirm legal access, check zoning and land-use rules, and identify which permits your project will need.
2. Assuming water will be easy to arrange
Water isn’t something to sort out later. Confirm there’s a reliable, legal water source for your home, how much it can supply, whether it holds up in the dry season, and what approvals or connections are required.
3. Using a design made for a cooler climate
Plans designed for up north often don’t work here. Unshaded windows, poor airflow and closed-in layouts mean a hotter house and more AC. Walk through your lot’s orientation, breezes, slope and views with your architect and builder before plans are final.
4. Underplanning for sun and rain
Roof overhangs, covered terraces and well-placed trees cut direct sun and extend your living space outdoors. Openings for airflow need protection from rain and insects. Roofs, gutters and site drainage must handle heavy rain and move water away from the house.
5. Choosing the lowest bid
The lowest price isn’t always the best value. Bids can differ in scope, finishes, allowances and exclusions. Compare them line by line, and ask each builder to explain what’s missing or assumed.
6. Working without a clear written agreement
Before work starts, put it in writing: scope, responsibilities, materials, schedule, communication, how changes are approved, payment terms and how disputes are handled. If anything is unclear, get professional advice before signing.
7. Vague payment milestones
Tie each payment to a specific, verifiable stage of completed work, not a date or a general “progress payment.” Agree in advance what “complete” means and how it’s checked. Keep records of every approval, invoice and payment.
8. No contingency budget
Site discoveries, design decisions and weather can all change costs. That’s normal in construction. Agree on a reserve with your contractor.
9. Choosing materials without considering the coast
Salt air, humidity, sun and rain affect materials differently. Before you specify anything, ask how it performs in your exact location, what maintenance it needs, and whether replacements are easy to find locally.
10. No maintenance plan
Even durable homes need care. Before handover, list what needs regular inspection, cleaning or replacement (roof, drainage, finishes, fixtures) and who will handle it. Budget time and money for upkeep.
Plan with clarity.
Good planning makes building easier now and owning easier later.